Wednesday, April 23, 2008

Building the Sky Bridge

The corner where the sky bridge connects to the Contempory 4th Floor outdoor landing (from above).




Based on the "covered outdoor Sky Way Bridge" description, I'm guessing that the sky bridge will be open to the air and not air conditioned. Here's hoping that I am wrong or it may also be open to the rain as it does sometimes come down sideways in Florida.